日本看片一二三区高清-无码专区亚洲综合另类-女人高潮抽搐喷液30分钟视频-免费观看黄网站在线播放-午夜精品久久久久久久99热

上海金泰工程機械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

主站蜘蛛池模板: 久久精品亚洲精品无码| 国产精品无码久久久久久| 亚洲gv永久无码天堂网| 亚洲最大av无码网站| www国产亚洲精品久久| 久久18禁高潮出水呻吟娇喘| 午夜人成免费视频| 欧美野性肉体狂欢大派对| 色婷婷综合久久久久中文| 国产av明星换脸精品网站| 夜夜躁狠狠躁日日躁| av无码免费岛国动作片片段欣赏网| 最近中文字幕mv在线资源| 欧美性色老妇人| 性欧美疯狂xxxxbbbb| 日韩亚洲国产中文字幕欧美| 伊人久久大香线蕉aⅴ色| 免费观看又色又爽又黄的韩国| 丁香婷婷色综合激情五月| 老子影院无码午夜伦不卡| 国产久青青青青在线观看| 亚洲精品一区二区三区蜜臀 | 亚洲国产精品久久亚洲精品| 亚洲乱码卡一卡二卡新区仙踪木木| 狠狠做五月深爱婷婷伊人| 无码亲近乱子伦免费视频在线观看 | 国产精品刮毛| 国产精品日日做人人爱| 特黄特色大片免费播放器图片| 亚洲精品乱码久久久久久蜜桃不卡 | 亚洲欧美成aⅴ人在线观看| 狂野欧美激情性xxxx| 国产精品黑色丝袜在线观看| 中文无码一区二区不卡αv| 精品日产一卡2卡三卡4卡自拍| 久久国产乱子伦精品免费午夜| 国产精品无码久久av不卡 | 国产三级无码内射在线看| 亚洲国产99精品国自产拍| 免费观看全黄做爰大片国产| 伊人狠狠色丁香婷婷综合|